Latest Posts

Steel Structure Construction, Steel Building Installation

Steel structure construction is not affected by the season. Even in the rainy season, it can be constructed. Simultaneously, construction in the rainy season will cause a lot of inconvenience to us, so what must be paid attention to constructing steel structures in the rainy season?Precautions for steel structure construction in Rain Season:1. Construction deploymentTo ensure the normal progress of construction during the rainy period, to ensure the project’s quality. The project’s main procedures and weather-sensitive procedures should be made technically following the rainy season construction characteristics, and the materials and various machines and tools should be fully prepared. Relevant personnel make a construction plan for the rainy season and provide technical preparations for the construction. Besides, the construction materials must be prepared for the rainy season, such as water pumps, water pipes, plastic sheets, raincoats, rain boots, etc.2. Pre-arrangement for steel structure constructionBefore starting the rainy season, it is necessary to ensure the smooth flow of information, predict the storm’s severe conditions based on the forecast, and take effective safety measures to strengthen prevention. Reasonably arrange construction according to the weather conditions, arrange work indoors in wind and rain, do a good job of interleaving procedures, and improve work efficiency and construction speed. Construction should be stopped in severe stormy weather to ensure personnel safety. Attention should be paid to ensure the safety of the working surface and the necessary temporary reinforcement measures. High-strength bolts cannot be installed on rainy days, and there should be no rain on the friction surface and high-strength bolts.3. Construction protection in the rainy seasonDuring rainy season construction, the need for rainwater protection of construction personnel shall be ensured. Pay special attention to electrical protection during construction. When it rains, except for special circumstances, high-altitude operations should be stopped. High-altitude personnel should be evacuated to the safety inspection area, and the power switch should be turned off. Ensure the safety of electricity.Do a good job of on-site drainage, use the natural terrain to ensure the drainage direction, and dig drainage ditches according to the prescribed slope to ensure unimpeded drainage.Protection of raw materials, finished products, and semi-finished products. Carry out regular inspections of the material warehouse and drain the surrounding area to ensure quality and safety. Materials that are too late to be placed outside should be protected by water pumps, plastic sheets, and linoleum in time.4. Steel structure hoistingFor the steel structure hoisting, the facade net must be hung on the outside of the building, and guard railings must be installed at the entrance of the building’s internal stairs and adjacent sides of the building. Clean up the soil before lifting the steel structure after rain.For the components to be hoisted, the water on the component’s surface should be cleaned first, especially the component’s friction surface, and the surface layer should be dry. The on-site garbage should be cleaned up in time. If it is not cleaned up in time, the garbage must be covered to prevent it from being washed away by rain. Toxic and harmful garbage must be collected in the classified garbage room on time.If the wind force is greater than level 5, rain or dense fog, stop the supporting procedures of high-altitude hoisting and installation, such as welding, laying pressed steel plates, wearing high-strength bolts, correcting structures, etc. All electrical equipment and electric boxes should be checked for re-construction after rain. The door of each electric box must be closed and not open. 

Latest Posts

spot_imgspot_img

Don't Miss

Stay in touch

To be updated with all the latest news, offers and special announcements.